![portfolio-gallery-image-4977 5](https://emianconstruction.com/wp-content/uploads/2024/05/5-1170x780.jpg)
![portfolio-gallery-image-4978 10](https://emianconstruction.com/wp-content/uploads/2024/05/10-1170x780.jpg)
![portfolio-gallery-image-4979 15](https://emianconstruction.com/wp-content/uploads/2024/05/15-1170x780.jpg)
![portfolio-gallery-image-4980 25](https://emianconstruction.com/wp-content/uploads/2024/05/25-1170x780.jpg)
![portfolio-gallery-image-4981 27](https://emianconstruction.com/wp-content/uploads/2024/05/27-1170x780.jpg)
![portfolio-gallery-image-4982 30](https://emianconstruction.com/wp-content/uploads/2024/05/30-1170x780.jpg)
![portfolio-gallery-image-4983 35](https://emianconstruction.com/wp-content/uploads/2024/05/35-1170x780.jpg)
![portfolio-gallery-image-4984 40](https://emianconstruction.com/wp-content/uploads/2024/05/40-1170x780.jpg)
![portfolio-gallery-image-4985 50](https://emianconstruction.com/wp-content/uploads/2024/05/50-1170x780.jpg)
![portfolio-gallery-image-4986 55](https://emianconstruction.com/wp-content/uploads/2024/05/55-1170x780.jpg)
![portfolio-gallery-image-4987 60](https://emianconstruction.com/wp-content/uploads/2024/05/60-1170x780.jpg)
![portfolio-gallery-image-4988 70](https://emianconstruction.com/wp-content/uploads/2024/05/70-1170x780.jpg)
John Street
Looking to transform their newly purchased Condo on John Street, a vibrant young couple sought our expertise to address their dissatisfaction with the kitchen, flooring, and bathroom. Prior to the closing date, we conducted a thorough inspection of the property and presented them with a comprehensive design proposal for both the kitchen and bathroom, complete with a detailed quote.
Following several rounds of revisions and discussions, the finalized contract was signed, and our team promptly commenced work on the project just one day after the closing date. Our skilled craftsmen diligently installed sleek new kitchen cabinets, a stylish countertop, and an eye-catching backsplash. In the bathroom, we removed the outdated bathtub and replaced it with a modern stand shower, instantly elevating the space. To complement the revamped interiors, we laid down premium laminate flooring and meticulously painted every wall and ceiling.
Despite the scale of the project, our dedicated team completed the renovation in under two months, much to the delight of our clients. Thrilled with the exceptional results, they now enjoy a beautifully transformed living space that perfectly aligns with their vision and lifestyle.